Skip to content Room to grow
- New research in the National Grid Operator era takes your solar, batteries, wind, gas plants, hydro units and superchargers past their old top levels.
- The HQ campus grows: nine rooms go two levels higher, and the Operations Center reaches level 10.
- Bulk substations climb past 6,000 MVA with 500 kV and 765 kV yards, and every line between regions gets two more levels.
- Every plant sells through a connection of its own: Mirage Flat gets a project substation, Raven Ridge its own switchyard bays, and a dozen switchyards and collectors grow taller so a fully built site sells everything it makes.
- The Gulf Energy Island can build its AC hub and export halls.
- Next upgrades has a Types menu to switch whole kinds of orders off, and a new line is offered at the biggest size you can pay for.