GRIDCONTROLLER Play
Version 0.40.0

Two ways to the grid

  • Every plant and lease with a single way to the grid can research a second one, so upgrading a connection no longer has to take the whole site dark.
  • Orders that would cut a site off the grid now show in red and ask first.
  • A feeder cutover no longer waits for an outage to be repaired: the faulted area stays switched out at the end of its new route, and every area past it gets its power back.
  • Next upgrades runs a new area's line from an empty feeder first, so a town no longer hangs off one long line, and an area's card says what it needs before it can be dual-fed.
  • Alarms a crew is already working on still pop up, but no longer sound.
  • Fort Tamarack and Tamarack Lake are now Fort Erie and Lake Erie.
  • Fixed: batteries charging under the balancing authority could set off rotating outages in the valley.