People do the work

  • A plant that trips stays down until a crew repairs it: your Field Technicians and Line Crews fix coal, gas and hydro units the way Nuclear Technicians fix reactors, and the dispatcher sends them on its own.
  • Crews are sent least experienced first, so new crews level up and catch up with the rest.
  • You can work as a builder: switch on "You on work orders" in the builder roster. While you build you are off every other job until the order is done.
  • Capacity Planning and Overload Dispatch never sit idle: with every builder busy they queue the work in your Scheduling Office or hold it for the first builder who comes free, and they act on the peak of the last two game days, not the load at the hour.
  • A repower costs at most $1M, whatever the unit.
  • A new research, Interregional Line Uprates II, takes every line between regions past its last level, up to 10,000 MW on the AC corridors and 12,000 MW on the HVDC links.
  • Batteries enrolled for fast frequency response keep the charge it needs, so trading never empties them out of it and your grids stay secure through the evening peak.
  • Adaptive Load Shedding no longer waits for your grid to shed load first, and the storage research counts every tonne you take into storage.
  • A company still on its starting name gets a name of its own, a power pun, and so does every new one. Rename yours any time from the Company panel.
  • The game server now runs companies side by side, so a big company never slows anyone else down.