GRIDCONTROLLER Play
Version 0.57.4

A shorter road to the utility

  • Distribution Engineering now needs a peak of 400 kW of generation instead of 500 kW, so producers reach the Cedar Hollow franchise sooner.
  • The "Get licensed" goal now names both research steps it needs: USB-C Power Delivery, then the Electrician Apprenticeship.