GRIDCONTROLLER Play
Version 0.57.6

Room to grow between regions

  • Interregional Line Uprates XI adds four more levels to every line between regions, up to 121,000 MW on the Prairie and Shield Lines and 117,000 MW on the Sunbelt and Gulf Links.
  • The ties into the regions you buy grow by four levels each behind Uprates XI: more 1,000 kV circuits and a UHVDC overlay, or more bipoles on the DC links.