GRIDCONTROLLER Play
Version 0.58.23

Forty more levels between regions, six more on every market hub tie, and a Dispatch Board you can clear

  • Interregional Line Uprates XVIII adds forty more levels to every line between regions: twenty more corridors on the Prairie Line and the Shield Line (up to 695,000 MW) and on the Sunbelt Link and the Gulf Link (up to 691,000 MW), and forty more overlay bipoles, bipoles or converter stations on every tie into a bought region, about 70% more power on each of those ties. Your hubs already carry them all with one line out.
  • Three new National Markets research projects, Hub Tie Converter Blocks, Hub Ties at 765 kV and Hub Tie Bipoles, add six more levels to every market hub tie, from a second converter block to HVDC bipoles of your own: up to 8,500 MW at the valley's hub and up to 68,000 MW at the hubs of the largest bought regions, more than double what each tie carries today. The hub still buys only what pays more there than the rest of your sales list.
  • The Dispatch Board lists a planned outage only when it pays: an outage that would cost more than the trips it saves no longer shows, so the board can be cleared. A unit's own panel still plans an outage whenever you want one.
  • A day a coal train or a reactor reload arrives now counts as the normal day it is: fees and rewards worked out from a normal day's income no longer drop to almost nothing on those days.
  • The Ops wall at the HQ keeps its alarm counts and its expand button in view however many sites, towns and regions you run.
  • On Linux the Steam app no longer gets stuck behind Steam's overlay when another game's invite opens it: the overlay is off there by default, and adding --gc-overlay to the game's launch options in Steam turns it back on.