Skip to content Room to grow
- Cedar Flats gets a long row of smaller tracker or fixed rows along its whole north edge, beside the big 1 MW blocks: a cheaper way to grow a solar farm a row at a time. North Edge Rows (First Farm) opens them at your first Cedar Flats and North Edge Rows (Second Farm) at your second, each $50,000.
- Ridgeway can now hold 10 turbines: Ridgeway Infill West and Infill East each add two pads along the crest road.
- The Riverside gas plant lot can add three more engine halls with Riverside North Yard, and the desert battery yards at Saguaro Flats and Painted Wash two more pads each with Basin Yard Expansion.