Work Orders has a new Nearing capacity tab: every inverter, outlet, battery, cable, transformer, feeder, substation, line and server, sorted by the most of its capacity used in the last 48 game hours, with its use now, when it peaked and why, and the order that relieves it with an Order button. Amber from 90%, red at or over the rating. The iPhone app shows the same list.
The wind now varies like real wind: calm spells are rare, most hours sit in the middle, and some days blow hard, with storms on top. Small turbines gain the most from the windy days.
Higher level wind turbines ride through stronger wind before they stop for safety, and a turbine at its top level keeps turning in any wind, storms included.
New research: LiDAR Vegetation Surveys (after Vegetation Management and GIS Mapping). Survey flights map the trees along your feeders, and your vegetation crews head out on their own to the most overgrown feeder once it passes your threshold, one crew to a feeder, while line crews stay free for outages.
Set the threshold in Crews, Automation, right under the wash crews' auto-clean, and see which feeder is most overgrown right now. The iPhone app has the same setting.
Work Orders: contract builder and auto-wash vouchers now have a Use button right in the Vouchers strip.
New players get a guided walkthrough of their first minutes: pedal the bike, make your first sale, order your first upgrade, and see where to look next.
Every display now explains itself with a short guided tour the first time you open it, and displays that open later get a tip at their button. Handy controls like Lend a hand, boosts, contract offers, battery modes and tie lines get a one-time tip when they first appear.
Settings, Tutorials: switch tips on or off, replay the first minutes, reset all tips, or replay any tour. Already playing? You will be asked once whether you would like tips for the displays you have not used yet.
New research for the regions' leases: a South Lease row of two more turbine strings at Antelope Flats, Sweetgrass Ridge and Coteau Hills, an Outer Block row of offshore strings at Pelican Shoals and Sabine Banks, a South Crest row at Ptarmigan Ridge, and a West Field column of two more arrays at Tamarack Lake Solar.
Empty offshore strings, ridge strings and northern arrays now show a spot outline the size of what goes there, so they are easy to find and click.
Ptarmigan Ridge no longer shows black holes in its deepest hollows.
Slurs and hate speech are now blocked in chat, company names, profile names and Power Pool names and tags. Ordinary swearing is still fine. A company name from before that breaks the rule has been changed to Power Company, and you can pick a new one in the Company window.
Answer the phones now asks for 10 calls you handle yourself instead of 20.
Smart Depot Chargers now start your waiting trucks one after another over the first two off-peak hours instead of all at once, and the Crews panel shows each truck's own start time.
New research: Smart Depot Chargers (Operations, after Electric Fleet). While your HQ pays the peak rate, parked crew vehicles charge only on spare power (solar the office is not using, battery energy the office will not need that evening, your pool's spare power through a tie line) and wait for the off-peak rate for the rest. A pack under half still charges right away, so no crew rolls out low and no job waits on a charge.
The Crews panel shows OFF-PEAK for a waiting vehicle, the HQ power section counts them, and the HQ bill shows what smart charging kept off the peak and saved today. Waiting trucks stay plugged in at the HQ with a blue standby light.
Skins and items bought with Grid Bonds now belong to your account: every company you run has them, including new ones. Seasonal and earned items stay with the company that earned them.
Distribution Engineering now needs a peak of 500 kW of generation instead of 800 kW, so producers reach the Cedar Hollow franchise sooner, and a new utility's first areas start with more early adopters signed up.
Fixed: buying a regional utility counted as a game day with no income, which shrank daily rewards, season track money and event costs for that day.
The Wardrobe's Van livery section now holds your liveries and your work truck skins together, earned, staff-issued or bought in the Shop. Whatever your trucks actually wear is the one marked Equipped, and the loadout drawing shows it.
Picking a livery there paints the whole truck in it again, taking off a truck skin, and Reset to default goes back to the standard van. A truck skin still keeps your livery's stripe and emblem. The Shop works the same way, and the iPhone app's Wardrobe lists both too.
Equipment skins you own now come first in the Wardrobe, so your purchases are easy to find and switch.
The Shop now sells Grid Bonds packs, from $0.99 to $99.99 (US dollars). Checkout runs on Team Hydra's secure payment page, where you pick card or PayPal, and you come straight back to the game with your bonds added and an invoice number for your records.
If you close the tab before coming back, the payment is still picked up within a few minutes. Your purchase history in the Shop lists every pack with its invoice. Packs are bought on the website; the iPhone app does not sell them.
Lasting effects from company decisions (a raise you matched, a shadow flicker fix) now run 30 game days and then fall off, instead of staying forever and piling up late in the game. Effects you already had get their 30 game days from today.
News and Events lists every effect under its event's name now, not a code name.
The Collection now covers nearly everything you build: 42 new skins for the Company HQ and its rooms, home batteries, inverters and generators, the exercise bike, home solar mounts, solar field racking and canopies, fleet and home chargers, and your work trucks.
Each card says how a skin sits with your other cosmetics: an HQ skin keeps your livery's stripe and emblem, a truck skin repaints the bodies while your livery's stripe and emblem stay on, and solar skins dress the racking while your panel frames stay as they are. Trucks and chargers preview in 3D too, diesel and electric alike.
The Collection grows by 56 skins: offshore wind, gas engine halls, gas turbines and peakers, combined cycle, district heat plants, coal units, small modular reactors, the large reactor, the sodium reactor, hydro units, the power tower, central inverters, transformers and substations, and street gear, four each from a common recolor to a legendary showpiece.
Every one previews in 3D before you buy, with close-ups for the biggest plants, and the Collection sorts them under Generators and Grid gear.
Cedar Flats gets a long row of smaller tracker or fixed rows along its whole north edge, beside the big 1 MW blocks: a cheaper way to grow a solar farm a row at a time. North Edge Rows (First Farm) opens them at your first Cedar Flats and North Edge Rows (Second Farm) at your second, each $50,000.
Ridgeway can now hold 10 turbines: Ridgeway Infill West and Infill East each add two pads along the crest road.
The Riverside gas plant lot can add three more engine halls with Riverside North Yard, and the desert battery yards at Saguaro Flats and Painted Wash two more pads each with Basin Yard Expansion.
You level up too: lending a hand, field work as yourself, pedaling, walkdown fixes, washing and desk work done by hand all count. Each level makes your hands-on work a little stronger, your name warms toward crimson as you near level 100, and past 100 it glows. Lifelong Tradecraft, late in the new People research branch, opens levels up to 1000. You start at the level your work so far has earned.
Staff can now pass level 20: the new People research branch raises their cap ten levels at a time, from Apprenticeship Program early on to the last step in the final era. Bonuses stay exactly as they were up to 20 and grow faster after it, to double at level 100: builders and crews work twice as fast, office staff effects are twice as strong. Experience past the cap is banked and counts the moment the next step is researched.
People now shows what levels do: a table of every role at level 1, at your current cap and at 100, the next cap research, and each person's bonus right beside their level.
Reactor operators' levels now shorten refueling outages. Names color against a fixed scale to level 100, so crimson now means the very top.
Your first winter is on us: until Feb 1 of the year after your company was founded, cold weather does not affect it. For everyone playing now, that is until Feb 1 Y2.
While it lasts: no battery cold losses, no icing on turbine blades, no snow on your panels, no ice faults on your lines, ice storms and blizzards do no extra damage and do not slow your crews, cold events like the polar vortex pass you by, and heating demand stays mild.
Prices, the weather itself and other storms stay as they are for everyone. Look for the WINTER GRACE chip beside the season in the top bar; News and Events lists it too, and a notice tells you before it ends so you can research battery heating and blade de-icing.
The Shop's new Collection: Grid Bonds skins for your equipment, starting with backyard and utility wind turbines, battery containers and supercharger plazas. Each skin recolors every unit of its family at every site, from simple recolors to two-tone finishes with accent lights, patterns and showpiece legendaries.
Every skin has a live 3D preview before you buy: turn it, zoom in, switch between the models of its family and compare it with the factory finish. Buying a skin also puts it on; switch skins or go back to the factory finish anytime in the Collection or the Wardrobe.
Skins are looks only and never change performance. Your welcome gift of 150 Grid Bonds covers a common skin. More equipment families are on the way.
Setting up a new property is now a builder work order. You can buy a property even when every builder is busy; its setup starts the moment a builder is free, the oldest purchase first.
While it runs it works like any order: free builders help, Double-Time Weekends double it, a boosted builder speeds it up 10x, you can lend a hand on it in Builders, and the builder earns experience for it. A setup cannot be cancelled.
Setups already under way keep their time left, and a free builder takes each one over so it can be helped and boosted too.
A boost now pauses while its builder has no work at all (no order of their own and none to take over), and its time left waits for their next order. The same goes for a boosted research slot with no project. The countdown says PAUSED meanwhile, and a boost bought with nothing to do starts paused.
Executives' names now follow the same colors as the rest of your staff, from cool blue toward crimson as they near their top level, in People and on the Executives panel.
When several builders are free, a new order now goes to the lowest-level one, so your newer builders keep levelling while your top builders are picked last. A builder with a boost running still gets the next order first, so the boost is never left idle.
A boosted builder who runs out of work now takes over the running order with the most work left from a builder who is not boosted. That builder is free to help elsewhere and keeps the experience for the part they finished. A boosted research slot with no project takes over a running one the same way, so a boost only runs unused when there is no work at all.
Grid Bonds no longer skip work. In their place, the Shop's new Boosts tab runs one builder or one research slot 10 times faster for 15 minutes, 1 hour or 4 hours. Nothing finishes at once: the work just runs faster, and the boost carries on to that builder's next order. A boosted name glows with a gradient and a countdown in People, Builders and Research.
Your regular staff now level up, like your executives, from the work they finish: builders from their orders, crews from their time on site, office staff from their role's work. Every level makes them a little better at it, and their names warm from cool blue toward crimson as they near the top level, 20. A level goes with an employee you let go.
Everyone already on your payroll starts at the level their work so far has earned.
Hiring a builder now costs 20% less, and you get the difference back for every builder you already hired.
What's new now shows what an update changed for your company, at the top, the first time you open the game after it.
Cedar Bluff's solar can now grow up the farm lane toward turbine 1: four new research projects, Lane Rows I to IV, each add four more ground rows the size of the first patch, right beside it on the same side of the lane. The Gate Field and Turbine Field rows across the lane stay where they are.
Power sharing in a Power Pool now only uses spare power your trading deals did not already deliver, so the same energy is never paid for twice.
Every site now shows its tie line to your grid. Your generation sites are tied in through their interconnection already, with nothing to build; your house and HQ keep their tie line order.
A tied site that runs short draws your pool's spare power before it buys anything: the power your customers and contracts leave, which would otherwise sell on the market. It costs you only that market sale. The HQ's office and fleet chargers, your superchargers and their batteries, and your house's neighbors all use it, whichever way the tie line sends its exports.
A tied house keeps its neighbors lit from your pool through a street outage.
Each tie line card shows what the site drew from your pool today and what it saved, and the HQ's power bar and one-line diagram show the pool's share.
Cedar Bluff can grow its solar: two new research projects, Gate Field Rows and Turbine Field Rows, each add four ground rows the size of the first patch, east along the bluff up to turbine 3.
Friend power: when your batteries on Market buy power in a cheap hour, it now comes from your friends' spare power first whenever that is cheaper than the grid. The price lands halfway between what the market paid your friend and what the grid would have charged you, so your friend earns more than the market paid and you pay less than the grid charges.
Only spare power your friends would have sold on the market counts: never what their contracts, their Power Pool or a trading deal would have paid more for. It is settled after the fact as money, and both switches live in Social, Friend power, on by default.
The Friend power tab shows where your spare power went and where your battery charging came from, friend by friend, today and this week, and Finance shows the extra as Friend power sales and Friend power savings.
Every account gets 150 Grid Bonds as a welcome gift: new accounts when they sign up, and everyone who already plays right now. Spend them in the Shop to finish a build or research early, or on cosmetics.
Electric Fleet, a new Operations research in the utility era: your crews' vans and trucks go electric, in your company colors with your logo, and the HQ gets a depot charger at every fleet bay and stall.
Fleet fuel ends with it. Each job's energy, the drive there and back and the work on site, is charged back at the HQ when the crew returns: from the HQ's own solar first, then its batteries, then the grid. The Crews panel shows each vehicle's charge and CHARGING while it fills.
Until then your crews run on diesel: every finished job by your own crews costs a little fleet fuel, shown in Finance. You walk to your own jobs, and contract and mutual aid crews bring their own trucks.
The Back Forty's north turbine pad moved further north, so its rotor clears the south one. The field's pads now take turbines up to the 250 kW class: a 2.5 MW rotor is wider than the whole field. Build those at Cedar Bluff or Ridgeway.
The lot-line towers behind your house no longer take the clicks meant for the back fence's last panel.
The LAN party next door has gaming chairs: the players sit at their desks instead of floating in front of them.
The Settings button stays in the top bar on very small screens: the least important readouts make way instead.
Your Grid Bonds balance shows right on the Shop tab.
A patrol that finds a fault now reports it and tells you, so you can send a line crew straight away. A fault behind a fuse sends no breaker alarm and a few customers may never call, so before this it could sit dark with nothing to click.
Clicking a feeder or a dark service area now shows every outage on it, reported or not, with Patrol and Send line crew right there. A service area also shows the devices on its line, with a link to the feeder's upgrades.
The Feeders table shows each feeder's devices as colored chips with counts, in the same colors as the lines and the legend, and offers dispatch for any outage on the row. Device chips in the feeder panel now wrap instead of running off its edge.
The funds counter is sturdier after big purchases: a busy moment no longer drops a healthy connection, and the counter redraws itself if it ever stops.
Cedar Bluff, a $500,000 property on the windy bluff above Cedar Hollow, opens with Distribution Engineering: fewer ground rows and more turbine pads than the Back Forty, six equipment pads for battery containers and a supercharger plaza spot. East Bluff Lease adds two turbine pads and four more pads.
North Field Lease adds four ground rows to every Back Forty.
Grid support, a new battery mode at your generation sites: the batteries carry your utility's customers whenever they would run on imports, most of all at night, and charge from power that would otherwise be clipped or sold on the wholesale market. A new Cedar Bluff starts in it.
Supercharger plazas run their own microgrid. The canopy takes solar sections from Lv 3, with more at Lv 4 and 5, a battery pad at Lv 6, and a new final tier (Lv 7) for the full canopy. Canopy solar and the plaza battery charge the cars first, never send anything back into the site, and the plaza only draws on the site for what they cannot cover. The plaza battery charges from spare power or, set to Buy at low, also buys in the cheapest hours up to the share you keep ready for drivers. Plazas already at Lv 3 or higher get their new spots right away.
Every battery now charges and discharges faster at each upgrade, in step with its capacity, so a bigger battery never takes longer to fill. A full home battery stack moves 20 kW instead of 11.5 kW. Batteries you already own get the new speeds at their current level.
Customer Service Reps now cost $100 a game day in wages instead of $400. Hiring one still costs $25,000.
Driveway carport power no longer goes to waste: with Export Fallback Relay, what your house, its batteries and the neighbors cannot use goes up your tie line into your own grid, or without one through the meter at the wholesale price.
The Operations Center now stands on its own lawn west of the HQ employee lot, with a drive to the road, instead of overlapping the supercharger plaza.
Funds below zero no longer raise an alarm or a welcome back warning. Your funds turn red and the Finance tab keeps its mark instead.
The bank charges loan interest (0.4% a game day) on an overdraft for as long as it lasts. It is taken once your funds are back above zero, never more than you have, so it can never put you back below zero. Finance shows what is owed.
Double-Time Weekends: from the Friday night reset to the Sunday night reset the Grid Resilience Fund pays contractors and lab engineers double time, so builder orders and research run twice as fast. It shows on the timeline like any world event, and this weekend is already on.
Instant Export Dispatch, a research after Automated Export Dispatch: Auto switches the moment the other side pays more and counts what your own contracts with room pay, so a well paid contract in your grid wins over net metering even when the market is cheap.
Operations know-how comes from more of the work you do running the grid: crews your dispatcher or call service sends now earn half of what sending them yourself does, and line devices, storm plans and signed contracts earn it too. Answering calls earns more, and your call service earns some. Every company got credit for the work it already did.
A research you are short of know-how for now says how much you have and exactly how to earn the rest.
What you have read in each chat is now saved with your account instead of in one browser: read a chat on your computer and its unread count clears on your other tabs, other browsers and the iPhone app at once.
GridController now lives at gridcontroller.app. Old grid.hep.gg links bring you there, already signed in.
Stacked Inverters, a cheap homestead research after the Backup Gateway: microinverter kits, string inverters and hybrid inverters at your house go two levels higher (a hybrid inverter up to 48 kW), so a fully built home can export everything it makes instead of running into its inverters.
Reclosers, sectionalizing fuses, tie switches, regulators and capacitor banks now order in one click from Next upgrades, at the spot on the feeder where they do the most good, with a line saying what they do for your customers there. The feeder form marks what is installed or on order and never lets you order the same thing twice.
Your lines are color coded by what protects them: reclosers tint the sections they cover, fuses theirs, and the feeder table shows each device as a colored chip with a legend.
Smart meters now tell you what every caller's meter reads, an outage, low voltage or power normal, so triage is never a guess and your call center never gets one wrong. They no longer cut down the calls themselves.
Calls the after-hours call service already answered no longer count as waiting on the rail, the Outage board or the phone app.
Your builders now stand at the work while a unit is built or upgraded, with one more for every free builder helping out, so you can see a helped order at a glance.
Lifetime statistics now show your Time at the console, counted from this update.
Staff are testing two new regions (the Hurricane Coast and the Boreal Shield), an Operations Center beside the HQ, new season themes, step-by-step outage finding and power trading between companies. They open to everyone once they are tuned.