Skip to content Lines between regions that keep up
- The lines between regions now grow with your regions in the National Grid Operator era. The new Extra-High-Voltage Interties research opens their 765 kV and UHVDC levels and the phase shifters on the Prairie and Shield Lines, so the Interregional Line Uprates you already researched can finally be built.
- Supergrid Interconnection still opens Share mode, and it now adds two new top levels to every line between regions: Supergrid converter hubs and a fourth corridor.
- A line's card now names the research and the era that open its next level, and says what Share mode still needs.
- Overtime on a boosted builder or researcher now costs what the work left would take at normal speed.