Hiding a retrofitted condenser's next level in Work Orders no longer hides that unit type's upgrades at the site, and the reverse.
A reprocessing complex's grid tie upgrades now count what its lines draw: they no longer say they add nothing while the lines are short of power, and work on a complex's only tie warns that it cuts the site off.
The regions you buy from failing utilities now come with more plants: real sites with their own scenes, a nuclear station in the Nuclear tab where the seller ran one, each region a step up from the last.
Each plant arrives as its seller left it: some spots still to build, some units due a repower, and some of its second lines left for you to finish.
Regions you already own have been brought up to the same standard, with nothing taken away (see your Inbox).
The Continental Grid is closed for now while we work on it.
Transformer upgrades in the biggest towns no longer fail with an invalid kVA error.
Link your Steam or Discord account to your game account and its emblem is yours to wear, with a note in your Inbox. Accounts already linked have theirs now.
In our Discord, linked players get roles for being a Founder, for their furthest era, for a season Top 10 or Top 100 place and for their Power Pool, plus a Steam role for Steam players. Try /company, /leaderboard, /season, /pool and /market.
Every generator and building now has a full set of four skins, and skins with lights glow on small LED strips on every model.
Once a region is open, its own battery park comes up on the property market: the same yard, superchargers and plazas as Westgate Battery Park, with bigger battery blocks that cost less per MWh at each step from the plains to the north.
With Sell fuel as it is made switched on, a reprocessing complex now fills its output bay to the top and keeps running once it is full: only the fuel that finds no room is sold to the Strategic Fuel Reserve, and a P1 alarm tells you while that happens.
Your reprocessing complexes' output is now called Sellable fuel everywhere; reactors still burn Inspected fuel.
Inherited regions now always arrive with their power plants, lines and towns, even when your executives, office staff or builders speed up the regulators' review.
If one of your regions arrived without them, they have been handed over in the seller's condition, and what you paid for its towns separately has been refunded (see your Inbox).
With Sell fuel as it is made switched on, an output bay that is nearly full now sells its overflow to the Strategic Fuel Reserve at a quarter of the server's fuel price, so its lines never stop while your listing waits for buyers.
When your fuel sells, it now comes out of the fullest output bay first, so a paused complex starts again first.
A paused complex now says whether its output bay or its waste vault is full.
Every reprocessing complex past the first now draws as much power as its lines need: its grid ties carry the complex's full size, so Ironstone Lake and the others no longer run short.
The lines between regions now grow with your regions in the National Grid Operator era. The new Extra-High-Voltage Interties research opens their 765 kV and UHVDC levels and the phase shifters on the Prairie and Shield Lines, so the Interregional Line Uprates you already researched can finally be built.
Supergrid Interconnection still opens Share mode, and it now adds two new top levels to every line between regions: Supergrid converter hubs and a fourth corridor.
A line's card now names the research and the era that open its next level, and says what Share mode still needs.
Overtime on a boosted builder or researcher now costs what the work left would take at normal speed.
Every region you open now offers its own reprocessing complex, each a step up the last: it processes more cooled waste a day and has bigger output bays and waste vaults. Find them in the Reprocessing tab under More complexes, with the way to the property market.
Each new complex costs more than the one before, and its gear builds and upgrades in the same time as your first complex's.
A new top tier, the Triple Train Complex, takes every complex's lines two levels further. It opens with the Triple Train Licensing research in the Market Operator era.
34.5 kV Superconducting Cable (150 MW a feeder) now opens in the National Grid Operator era, so a city district that outgrows the 80 MW heavy cable has a rebuild in reach. The 240 MW twin cable still opens with the Market Operator era.
Clearer overload advice: a feeder that serves one area alone is no longer told to add a feeder, since an area cannot be split across feeders. It names the area's peak, the line it runs on and what opens the next heavier line, and Overload dispatch no longer waits on empty feeders that could never take its load.
A feeder that trips again and again keeps one notice for the day with a count, instead of a new notice every time.
Empty feeders that no area could ever move to were removed and their bays freed, and what each one cost is refunded. Your Inbox lists them.
Long builds level off. Short builds keep their times, and the longest now top out at about 12 hours for HQ rooms, chargers, plaza batteries and the house's gear, 36 for substations, lines and ties, 48 for generation and storage, and 96 for reactors, dams, the biggest plants and megaprojects, before your builders' speedups. A build already under way ends sooner to match.
Every level you already built that is quicker now gives your builders time back as 10x boost. Your Inbox shows how much each builder got.
More room at the top in the Market Operator era: new tiers for generation, storage, the HQ, charging and the nuclear families, including Supercritical Geothermal, Pumped Storage Uprates II, Campus Master Plan II and storage block tiers XIX to XXI.
Your biggest stations fit the grid when fully built: Twin Superconducting DC Links between regions, Plant Yard Expansion for larger plant switchyards, hub yards, buses and converters without buying a region, and Turbine Island Uprates for three more levels on every reactor site's turbines, cooling towers, intakes, salt tanks and switchyard bays.
Alarms you cannot act on yet show as information that names the limit, every alarm that fires says what fixes it, and reprocessing lines and reactor startups no longer run short of power behind a 69 kV hold.
A new sign-in screen, over footage of the game.
GridController has its own Discord server now: join at https://discord.gg/635rxu7quZ and link your account in Settings > Account > Discord to get your roles there. The old channel closes soon, so come on over.
Season 2 starts on November 3 at 01:00 UTC: Storm Season. An active storm track brings more street outages and feeder faults and is hard on outdoor equipment, but neighbors pay for every watt you can deliver in the dark. Its track carries the Storm Cell emblem, the Mutual Aid Network program, the Storm Chaser title, the Squall Blue pool tag and the Hurricane Warning flag.
When Season 1 ends, its final standings pay out: the champion, the top ten, the top quarter and everyone who finished get their rewards, and anything you reached on the Season 1 track but did not claim is granted automatically.
Regions for sale, opening with Season 2: in the Market Operator era, failing utilities sell their regions to you one at a time once you research Utility Acquisitions. Buy one on a deposit and an acquisition loan or outright, then restore it: return its units to service, rebuild its worn stations and lines, and watch its customers sign back up as their service comes back. Once a region is stable (nothing left to restore, every town on two lines, nine in ten of its customers back), the next one goes on sale.
Your first three purchases come with the Grid Relief Fund, which pays half of the restoration work as it gets done. Capacity Planning restores the regions you buy as builders free up, worst first, and new Operations research lets your builder roster grow to 80 and adds line crews, dispatcher seats and crew yards close to the new towns.
Ties from your own regions carry a bought region's load while its plants come back, and a market hub beyond every region buys your power by the hour whenever it pays more than your other sales.
The Continental Grid era: once every region you bought at home is stable, Continental Grid Planning opens a new era before the Supergrid, with the neighboring countries' regions, its own research, story, dailies, weeklies, achievements, cosmetics and events, and the Continental Council Hall.
Reactor sites climb past their old top levels in the Market Operator era, with more turbine, waste, fuel and support levels to match.
Every region beyond the valley grows in the Market Operator era: a new city, an industrial park, a data center campus and two new generating sites in each, more research for more generation, and a third circuit wherever a town's lines cannot carry it with one line out.
Rename any region from its card and your name shows everywhere. Region lists group your Home Regions, add a search once you have more than eight and show each region's state at a glance.
Capacity Planning no longer takes a 69 kV line out for work when that would leave a town, plant or station without supply.
Large companies step faster, a long run of orders no longer freezes the console, peak generation counts every plant you run, and game sounds in Firefox play on time.
If your browser draws the game without your graphics card, the Auto graphics preset picks Potato and the console tells you once, so the game stays playable.
If updates (and I) have been quiet lately, this is why: GridController is moving to a brand new engine. On the same computers, the valley map runs at over 100 frames a second where it manages about 35 today, and the home street at 120 where it manages about 46. More soon.