GRIDCONTROLLER Play
Version 0.36.4

Game room

  • New at the HQ: FireGamer3's Pinball Room across the street. Every level adds another pinball machine and a little employee satisfaction, for good.
  • Five new projects in Markets & Business grow it from one machine in the corner to a full arcade floor.
  • Made a typo in chat? Press Up in an empty chat box to edit your last message. Everyone sees the change.
  • Bigger lines past 345 kV for the largest sites: a high-temperature restring, then 500 kV and 765 kV.
  • The Regional Transmission Programs now open once a region has grown enough mature sites.
Version 0.36.3

Rate day

  • The bank's rate has its own world events. A Rate Crash halves it and a Rate Hike doubles it, each for 10 to 20 game days, and each is announced a game day ahead.
  • A loan signed during a crash keeps the low rate for its whole term. Loans signed before a hike keep theirs too, but the overdraft is charged at the rate of the day.
  • The Loans & credit tab says when a crash or a hike is coming or running, and the 30-day rate line shows it.
Version 0.36.2

Find it faster

  • Next upgrades has a place picker: choose a site, a town or a region to see only the orders there.
  • A customer calls alert opens the call queue on a town that has calls waiting, or on every town when several do.
  • The Exclude server checkboxes in the Nuclear Market match the rest of the game.
Version 0.36.0

Every region, one grid

  • The Sonoran Basin, the Hurricane Coast and the Boreal Shield run on the same rules as the valley and the plains: every site sells through a grid tie slot you buy, sized for its output, then its own tie and second circuit into the region's hub, N-1 counted, with the same checklist.
  • Power pays more the further you go: the Sonoran Basin half again the valley's price, the Hurricane Coast double, the Boreal Shield triple.
  • Site cards show a site's way out on every network, with buttons for its first tie and its second circuit, and the line view offers the second circuit wherever a first line stands.
  • The plains map draws its customers' substations and the market line, and every region site draws its generators' lines into its tie.